Current Projects

Bazoo Bar Croydon.

This project has just been completed and is ready for the canvas cover . The beams are all made from 10 mm laminated timber 360 mm x 80 mm curved beams and covered in a Quetek sealer to protect it from the weather conditions. The steel construction is all raw based look and is coated in a clear coat spray paint to protect it from rust. The project will be completed towards the end of the year.All beams were lifted into place with a 7 tonne Slew crane, with a 22 mtr boom on it. The whole project is bolted down to 1 mtr x 1 mtr x 1 mtr mass concrete blocks .